| Physical Infrastructure | Measure |
|---|---|
| Docking Sites | 2 |
| Front Dock Total | 624 m |
| Concession Total Area | 13,50 ha |
| Use Area | 10,27 ha |
| Asphalt Area | 11,8 ha |
| Warehouse Area | 1.976 m2 |
| Ground Slots | 6.356 teus |
| Draught Site Nº 3 | 9.3 m |
| Draught Site Nº 4 | 11.4 m |
Be acquainted with the investments materialized and expected by the company for the next years.
Investments materialized by ITI during its first operating years increased up to US$ 50 millions in:
Moreover, works were carried out in order to enlarge quay N° 4 area, which enables us to service vessels up to 348.5 meters length and 11.4 meters draft. It is important noting that quay N° 4 locationhas been designed to receive vessels Post - Panamax, so when this happens and if necessary, this quayside will be dragged up to 15 meters depth in order to serve these vessels.